Existing Planning And Conditions (Documentation For Phase 1 Appendix II)
District of Columbia Planning Documents & Considerations (Phase 1 RFP Appendix II, Section 8.1)
- Zoning Commission Notice of Final Rulemaking & Order No. 12-08: Text & Map Amendments to Create & Implement the Saint Elizabeths East (StE) District for the Saint Elizabeths East Campus): Click Here
- St. Elizabeths East Master Plan & Design Guidelines (June 4, 2012): Click Here
- United Medical Center Feasibility Study: Click Here
- Comprehensive Plan (Chapter 18: Far Southeast/Southwest Area Element): Click Here
- St. Elizabeths East Redevelopment Framework Plan: Click Here
Phase I Assessment (Phase 1 RFP Appendix II, Section 8.2)
Building Condition Reports (Phase 1 RFP Appendix II, Section 8.3)
Saint Elizabeths Hospital East Campus Historic Resource Survey (July 2011) Part 1
Saint Elizabeths Hospital East Campus Historic Resource Survey (July 2011) Part 2
Infrastructure Improvements: Stage One & Stage Two (Phase 1 RFP Appendix II, Section 8.4)
8.4 St. Elizabeths East Campus Stage 1 Infrastructure – Building Demolition Location Plan GE
8.4 St. Elizabeths East Campus Stage 1 Infrastructure – DC Water Preliminary Plan
St. Elizabeths East Campus Stage 1 Infrastructure – PEPCO Preliminary Plan
St. Elizabeths East Campus Stage 1 Infrastructure – Verizon Preliminary Plan
St. Elizabeths East Campus Stage 1 Infrastructure – Washington Gas Preliminary Plan